India’s Renewable Energy Journey: Powering a Cleaner Future
Source: PIB (Press Information Bureau) · Read the original ↗
Summary
PIB's backgrounder summarises India's renewable energy expansion across solar, wind, hydro, bio-energy, geothermal and green hydrogen. It quotes ~560 GW of total installed power capacity (October 2026), of which 308 GW (55%) is non-fossil (31 July 2026). It covers the Bharat Renewable Energy Summit & Expo (BRESE) 2026 in New Delhi (2–5 November) and several new schemes approved in 2026: PM-SSY (floating solar), the GOBARdhan National Circular Bioenergy Scheme, and the Small Hydro Power scheme.
Key facts for Prelims
- PM Surya Ghar: Muft Bijli Yojana: launched February 2024, outlay ₹75,021 crore, target 1 crore households. Nodal ministry: MNRE.
- Pradhan Mantri Surya Sarovar Yojana (PM-SSY): approved 31 July 2026, outlay ₹5,070 crore. It covers floating solar PV projects with energy storage systems.
- National Green Hydrogen Mission: approved January 2023, outlay ₹19,744 crore, target 5 MMT of green hydrogen production by 2030.
- National Bioenergy Programme: supports waste-to-energy, biomass and biogas projects. Phase-I covered FY 2021–22 to FY 2025–26.
- GOBARdhan – National Circular Bioenergy Scheme: approved 6 August 2026. GOBARdhan expands to Galvanizing Organic Bio-Agro Resources Dhan. CBG is compressed biogas.
- Small Hydro Power (SHP) Development Scheme: approved March 2026 for FY 2026–27 to FY 2030–31. It covers projects of 1–25 MW and supports hilly and North-Eastern regions.
- VGF scheme for 1 GW of offshore wind: approved by the Union Cabinet on 19 June 2024.
- National Policy on Geothermal Energy: notified 15 September 2025. The Geological Survey of India estimates potential of around 10,600 MW based on 381 hot springs. Geothermal cooperation mechanisms exist with Australia, Iceland, Saudi Arabia and the United States.
- India ranks fourth globally in installed wind power capacity.
- India's first indigenous hydrogen fuel cell-powered train began operations on the Jind–Sonipat section in July 2026.
- BRESE 2026: held 2–5 November in New Delhi.
Data and details
- Total installed power capacity: around 560 GW (October 2026), up from 249 GW in 2014.
- Non-fossil capacity: 308 GW (31 July 2026), 55% of total.
- Investment in renewable energy: USD 63.7 billion during July 2024–June 2026.
- Country partners: Australia, Denmark, the European Union, France, Germany, the Netherlands, Norway, Sweden and the United Kingdom.
- 13 States/UTs took part, including Gujarat, Rajasthan, Maharashtra, Uttar Pradesh and Andhra Pradesh.
- 400+ manufacturers, technology providers, startups and research institutions exhibited.
- Discussion themes: financing, clean energy manufacturing, storage, emerging technologies, workforce development.
- Installed solar capacity ~175 GW (31 October 2026), up from 2.8 GW in 2014. Solar is the largest component of India's renewable capacity.
- In 2025, India was the world's second-largest solar growth market, adding over 37 GW, against 34 GW added by the United States.
- Rooftop (PM Surya Ghar): 65.26 lakh households benefiting (as of 2 November 2026), approximately ₹35,800 crore subsidy transferred, nearly 21 lakh households with zero electricity bills till October 2026, 19.1 GW rooftop capacity commissioned.
- PM-SSY: co-located storage of minimum two-hour duration, equivalent to 10,000 MWh.
- 6.05 GW added in FY 2025–26, the highest-ever annual addition and 46% above FY 2024–25.
- Around 28 GW additional capacity is under implementation.
- Wind turbine manufacturing capacity: about 24 GW (March 2026), up from 10 GW in 2014. Indigenisation is 70–80% across key components.
- Offshore wind VGF scheme: ₹7,453 crore for 1 GW.
- Bio-power capacity: 11.75 GW (29 October 2026).
- 839 CBG plants registered (2 November 2026), of which 210 commissioned and 255 under construction.
- Biomass cogeneration (30 September 2026): 9,821.32 MW bagasse-based, 1,047.85 MW non-bagasse.
- Waste-to-energy (30 September 2026): 324.24 MW grid-connected and 554.16 MW off-grid.
- National Bioenergy Programme Phase-I outlay: ₹858 crore.
- GOBARdhan scheme: ₹23,731 crore for FY 2026–27 to FY 2035–36. It aims to nearly ten-fold domestic CBG production and create a national circular bioeconomy.
- Cumulative hydro capacity, including large and small hydro: 57.49 GW (29 October 2026).
- SHP Scheme: ₹2,584.60 crore, about 1,500 MW.
- Green hydrogen offtake commitments signed by Indian companies since 2023: 5.5 lakh MTPA, described as the world's largest supply commitment. Over 70% are earmarked for exports.
- In 2026: 18 new offtake agreements covering over 4 lakh MTPA.
- Expected investment: around ₹90,000 crore (US$9.5 billion).
- About 8,000 tonnes per annum of capacity commissioned by February 2026.
- July 2026: 12 pilot projects for 70 hydrogen-powered vehicles across 21 routes.
- 42 geothermal manifestations are identified as promising areas.
- Five projects were sanctioned in July–August 2025, including a pilot production plant, resource assessment projects and a solar–geothermal hybrid plant.
Static–dynamic linkage
The static concept is India's energy transition strategy. It rests on energy security (reducing fuel import dependence), climate mitigation (the non-fossil capacity shift in India's climate commitments), and industrial policy (domestic manufacturing of modules, turbines, batteries, electrolysers). A recurring design problem is variability. Solar and wind need firming from hydro, storage and flexible sources, and hard-to-abate sectors need green hydrogen. The article's themes of storage, hydro "grid stability", geothermal and green hydrogen answer this variability problem.
Syllabus mapping: GS3 – Economy/Infrastructure: Energy; GS3 – Environment: Conservation, climate change mitigation; GS3 – S&T: Indigenisation, new energy technologies (green hydrogen, storage); GS2 – Government policies and interventions.
Background primer
PM Surya Ghar: Muft Bijli Yojana (rooftop solar)
- What it is:
- A Central Scheme to provide free electricity to one crore households that install rooftop solar, with up to 300 units free every month.
- Founded:
- Approved by the Union Cabinet on 29 February (2024) with an outlay of ₹75,021 crore. It aims to bring solar power to one crore households by March 2027.
- Mandate:
- Subsidy of 60% of the unit cost for systems up to 2 kW and 40% of additional system cost for 2–3 kW, capped at 3 kW. Collateral-free low-interest loans (about 7% at the time) for residential rooftop systems up to 3 kW. A "Model Solar Village" component of ₹800 crore, with ₹1 crore per selected village.
- Why it matters:
- Make households energy producers, cut electricity costs, and add residential solar capacity. Expected to add 30 GW of solar capacity, generate about 1,000 billion units over a 25-year lifetime and reduce CO2 emissions by 720 million tonnes.
National Green Hydrogen Mission (NGHM)
- What it is:
- A mission to make India a global hub for production, usage and export of green hydrogen and its derivatives, by targeting 5 MMT per annum by 2030.
- Founded:
- Approved by the Union Cabinet on 4 January 2023 with an outlay of ₹19,744 crore. The outlay includes ₹17,490 crore for the SIGHT programme, ₹1,466 crore for pilot projects, ₹400 crore for R&D, and ₹388 crore for other components.
- Mandate:
- Components include demand creation through exports and domestic use; SIGHT incentives for electrolyser manufacturing and green hydrogen production; pilot projects in steel, mobility, shipping and other areas; green hydrogen hubs; infrastructure; regulations and standards; and R&D.
- Why it matters:
- Green hydrogen is produced by electrolysis of water using renewable electricity. 2030 outcomes include about 125 GW of associated renewable capacity. Wide-ranging benefits include export opportunities, decarbonisation of industry, mobility and energy, reduced dependence on imported fossil fuels, and indigenous manufacturing.
Additional context
- Progress against the rooftop solar target can be read against earlier milestones. The scheme's planned installation milestones were 10 lakh by March 2025, 20 lakh by October 2025 and 40 lakh by March 2026. A Drishti IAS explainer on an earlier news item says a Parliamentary Standing Committee had highlighted slow progress in reaching one crore households by FY27. The article reports 65.26 lakh households as of 2 November 2026.
- Green hydrogen hubs: The government has notified three major ports, Deendayal Port (Kandla), V.O. Chidambaranar Port (Tuticorin) and Paradip Port (Odisha), as Green Hydrogen Hubs.
- Export ambition: The Mission's design document says that with growth of export markets and international partnerships, green hydrogen production capacity could scale from the 5 MMT target to 10 MMT per annum.
Mains dimensions
- Energy security and import dependence: Rising non-fossil share (55% of 560 GW) and localised manufacturing (wind turbines at 70–80% indigenisation; solar module and ACC battery PLIs) reduce external dependence.
- Decentralised energy and social inclusion: PM Surya Ghar had 65.26 lakh households connected, about 21 lakh with zero electricity bills and about ₹35,800 crore subsidy transferred. Open questions are discom finances, net-metering reliability and access for low-income households.
- Firming variable renewables: Storage (PM-SSY's 10,000 MWh co-located storage), hydro (57.49 GW) and geothermal address intermittency.
- Circular bioeconomy and rural linkages: The GOBARdhan scheme (₹23,731 crore) and the CBG buildout (839 registered, 210 commissioned, 255 under construction) link waste management, farm residues and energy. The gap between registered and commissioned plants is a delivery issue.
- Green hydrogen: ambition versus delivery: 5.5 lakh MTPA of offtake commitments, over 70% for export, compared with about 8,000 tpa of commissioned capacity by February 2026. The 2030 target is 5 MMT. Cost, standards and infrastructure are constraints, and export-oriented offtake raises the question of balancing domestic decarbonisation with exports.
- Global positioning and finance: India was second in solar additions in 2025, with USD 63.7 billion invested in July 2024–June 2026. BRESE's 9 country partners point to technology and finance partnerships.
- Land, ecology and equity: The article does not address the land and ecological footprint of large projects. Floating solar (PM-SSY) and offshore wind partly respond to land constraints.
- Way forward: Grid integration and transmission, storage scale-up, discom reforms, manufacturing depth, and standards for green hydrogen.
Possible Mains question
**GS3, 15 marks:** "India's renewable energy capacity has expanded rapidly, but integration of variable renewables into the grid remains a challenge. Discuss the role of storage, hydropower and emerging technologies like green hydrogen in addressing this."
Related topics
- India's climate commitments (NDCs, net-zero by 2070) and the International Solar Alliance
- PM-KUSUM and the Green Energy Corridor; Inter-State Transmission Systems
- Electrolysers and green ammonia; Hydrogen hubs
- Compressed biogas (CBG), SATAT, Swachh Bharat (GOBARdhan origin)
- PLI schemes for solar PV modules and ACC batteries
Topics: GS3
All current affairs of 13 November 2026 → · UPSC Current Affairs