NHAI Guidelines to Standardise Design and Infrastructure for Multi-Lane Free Flow Tolling on Four-Lane and Above National Highways
Fact cardPublished: · Updated:
Source: PIB (Press Information Bureau) · Read the original ↗
Summary
Paving way for wider adoption of barrier-less Multi-Lane Free Flow (MLFF) tolling system across the country, National Highways Authrity of India (NHAI) has issued guidelines to standardise design and infrastructure of toll plazas on four-lane and above National Highways. The guidelines will ensure that upcoming and ongoing National Highway projects are equipped to support MLFF based barrier-free toll collection without requiring vehicles to stop at toll booths. The initiative is aimed at elimina
Key facts for Prelims
- NHAI (National Highways Authority of India) issued a policy circular to standardise the design and infrastructure of toll plazas on four-lane and above National Highways for barrier-less Multi-Lane Free Flow (MLFF) tolling.
- MLFF is barrier-less toll collection: vehicles are tolled without stopping at toll booths or physical barriers.
- Stated aims: remove traffic queues and waiting time, cut fuel consumption at toll plazas, and make National Highway journeys safer and more seamless.
- The guidelines prescribe uniform requirements for toll plaza layouts, lane configuration, gantries, road infrastructure, lighting, signage and supporting facilities. They also set out an implementation framework for upcoming and ongoing projects.
- Because vehicles do not stop at barriers, the number of lanes needed at a toll plaza is rationalised compared with conventional toll plazas. This allows more efficient use of space and better traffic movement through the tolling zone.
- The guidelines emphasise adequate lighting and advance information to users through signage and Electronic Variable Message Signs (VMS).
- The guidelines also provide for an administrative building-cum-operations and maintenance centre for managing toll plaza operations.
- Applicability: all future and under-construction projects.
- Projects at the Detailed Project Report (DPR) stage will build the new design into their documents.
- Projects already awarded or under construction will adopt the changes through applicable contractual provisions.
- NHAI field offices are directed to incorporate the requirements in upcoming projects and facilitate adoption in ongoing ones.
- Earlier, NHAI released comprehensive guidelines for planning and designing High-Speed Access-controlled National Highways, other than Expressways. These bring uniform standards to DPR preparation for upcoming high-speed corridors, for greater consistency in technical standards and stronger road safety.
Related topics
- National Highways Authority of India Act, 1988 and fee collection on National Highways (toll policy, FASTag)
Topics: GS3
All current affairs of 6 November 2026 → · UPSC Current Affairs